ALL TRADES / DEMOLITION

Quotrr for demolition contractors

Demo is first on every schedule, which means the bid window is the shortest in construction. The GC or homeowner wants a number today, not Thursday. Quotrr turns your walkthrough into an itemized proposal before you are back at the yard, and gets it signed with a deposit before you mobilize bins and crew.

From walkthrough to quote

You scope the building, you talk the job into your phone on the way out, and Quinn drafts the proposal. Here is what that sounds like on an interior strip-out.

YOUR VOICE NOTE, 45 SECONDS IN THE TRUCK

"Scoped the Harper job on 14th. Interior strip-out of a 1,400 square foot single story, down to studs, kitchen and both baths included. Cabinets, fixtures, flooring, drywall, and the dropped ceiling in the den. Hardwood in the front two rooms stays, protect it. Asbestos report came back clean, keep a copy in the file. Two 40-yard bins, call it three days with a crew of four. They asked about the detached garage, slab and all, price that separate as an option."

WHAT QUINN DRAFTS, BETTER TIER SHOWN
Floor protection and dust barriers, hardwood preserved~$600
Interior strip-out to studs, approx. 1,400 sq ft~$6,800
Kitchen and bath cabinet and fixture removal~$1,200
Dropped ceiling removal, den~$400
Two 40-yard bins, haul and dump fees~$1,900
Final sweep, nail pull, broom clean handoff~$500

Drafted as good-better-best from the strip-out alone to strip-out plus the detached garage and slab, each priced as its own scope. Numbers above are example placeholders. You set your own pricing and approve every line before it goes out.

What eats your evenings

The bid window closes before your quote goes out.

Demo gets awarded to whoever answers first with a real number. If your walkthrough waits until tonight to become a proposal, somebody else's bins are in the driveway Monday.

KILLED BY: VOICE-NOTE QUOTING. THE PROPOSAL IS DRAFTED BEFORE YOU LEAVE THE BLOCK.
"While you're here" never hits the invoice.

The shed, the back fence, the extra slab. It comes up on day two, your crew handles it, and it gets eaten because there was never a written price for it.

KILLED BY: LIVE ADD-ONS, PRICED UP FRONT, THAT THE CUSTOMER TOGGLES ON THE PROPOSAL.
You mobilize iron and bins on a verbal yes.

Bin delivery, crew day rates and dump deposits are committed money. If the customer wavers after you have staged the job, the cancellation comes out of your pocket.

KILLED BY: E-SIGN PLUS DEPOSIT ON THE SAME PAGE THE PROPOSAL LIVES ON.

The same engine under every trade

What it costs

Free to run the work: leads, proposals, jobs, basic invoicing. Pro is $12.99 a week, $39 a month, or $299 a year when you want Quinn unlimited and the follow-up automation. Full pricing.

Nearby trades

Excavation Concrete Framing

Get early access